Skip to content

Global Capability Center

Your GCC should deliver, not merely exist.

Most GCCs start with a headcount plan and hope delivery follows. We design operating models, governance structures, and delivery systems that make your GCC productive from day one — not quarter four.

The challenge

Why most GCCs underperform in year one

Starting a GCC is straightforward. Making it deliver predictable value is not. These three patterns repeat across every stalled GCC we have assessed.

  • 01

    Headcount without operating model

    Teams are hired before delivery processes, escalation paths, and quality gates exist — creating expensive chaos instead of output.

  • 02

    No governance framework

    Headquarters and the GCC operate with different expectations, different metrics, and no shared accountability — friction compounds monthly.

  • 03

    Delivery metrics never materialise

    Without baselines, dashboards, and review cadence, leadership cannot tell whether the GCC is improving or just spending.

What we deliver

What we set up and run

From charter and operating model through hiring, tooling, delivery systems, and optimisation — every phase is structured, measurable, and transferable.

  • Operating model design

    Team topology, reporting lines, service catalog and cross-site protocols, set before the first hire.

    • Service catalog and SLA definition
    • Team topology and reporting structure
    • Cross-site communication protocols
  • Hiring and team ramp-up

    Competency frameworks, technical assessments and onboarding playbooks that shorten time-to-productivity.

    • Role-specific competency frameworks
    • Technical assessment design
    • 30-60-90 day onboarding plans
  • Governance and compliance

    Establish steering committees, escalation protocols, audit readiness, and regulatory alignment across jurisdictions.

    • Steering committee charter
    • Escalation and decision frameworks
    • Regulatory and compliance alignment
  • Delivery excellence

    Quality gates, sprint governance, release management and dashboards that make output measurable from week one.

    • Quality gates and code review standards
    • Sprint governance and velocity tracking
    • Release management playbooks
  • Performance metrics

    Define KPIs, build executive dashboards, and establish a review cadence that connects centre output to business value.

    • KPI framework and baselines
    • Executive reporting dashboards
    • Monthly review cadence design
  • Tooling and infrastructure

    CI/CD, observability, project and knowledge management tooling, selected and configured to your standards.

    • CI/CD and DevOps pipeline setup
    • Observability and alerting stack
    • Project management tooling alignment

The engagement loop

How a GCC engagement runs

  1. Understand

    The charter: why the GCC exists, which city and entity, which teams come first — and the handover date.

  2. Design

    Operating model, governance and the hiring plan, with 30-60-90 day onboarding written before the first offer.

  3. Deliver

    Build and staff, then run delivery on the metrics your headquarters already reads.

  4. Transfer

    Steady state: leadership, controls and vendor terms move to you on the date in the charter.

Engagement facts

What a GCC engagement looks like

  • Duration

    Charter to steady state in the four phases above; the handover date is written into the charter.

  • Team

    A GCC lead first, with hiring, engineering and operations roles added phase by phase.

  • Pricing model

    Set-up as a scoped programme; the run phase per team, with transfer terms agreed up front.

  • Where it happens

    In Bengaluru, in an entity and accounts you control.

Before you call

Questions buyers ask about GCCs

What is a Global Capability Center (GCC)?

A GCC is a dedicated engineering and operations centre that an organisation establishes to centralise capability, reduce costs, and accelerate delivery. Haivisoft helps design, launch, and operate GCCs with embedded engineering best practices.

How long does it take to set up a GCC?

A typical GCC setup takes 8 to 16 weeks depending on scale and complexity. This includes talent strategy, infrastructure provisioning, operating model design, and the first sprint of delivery.

What roles does Haivisoft hire for GCC teams?

We recruit across engineering, QA, DevOps, data engineering, AI/ML, product management, and leadership roles. Each hire is vetted against our technical assessment framework and aligned to your specific requirements.

Can Haivisoft manage the GCC after setup?

Yes. We offer ongoing management services including performance governance, retention programmes, capability scaling, and continuous improvement — or we can transition operations fully to your internal leadership.

What industries benefit most from a GCC model?

GCCs benefit technology companies, fintech, healthcare, SaaS businesses, and enterprises with growing engineering demand. Any organisation needing dedicated, scalable engineering capacity can leverage this model.

Keep reading

Keep reading about GCCs

Ready to build a GCC that delivers?

One conversation to assess your current state, define the operating model gaps, and map the first 90 days.

Discuss your GCC roadmap
GCC Setup in India | Global Capability Center | Haivisoft